Full-Process Professional Supervision

From manufacturing to shipping, covering every critical stage of transformer and BESS lifecycle.

01

Production Process Supervision

Full on-site monitoring of core manufacturing processes including core fabrication, winding, and core-coil assembly, ensuring compliance with design specifications.

02

FAT Witnessing

Independent witnessing and verification of all test items — insulation withstand, temperature rise, short-circuit impedance, and no-load performance — against IEC and contract requirements.

03

Packing & Shipping Supervision

End-to-end monitoring of disassembly, protection, nitrogen preservation, packing, and dispatch to ensure safe delivery across long-distance transit.

04

Personnel & Qualification Review

Review of qualification certificates and training records for key personnel, and verification of equipment maintenance status and material batch consistency.

05

Process Documentation Review

Comprehensive review of all in-process inspection reports and records, ensuring complete traceability and compliance with quality documentation requirements.

06

Technical Standards Consulting

Compliance consulting for IEC, GB and target market standards, helping manufacturers meet international high-standard market requirements.

Multi-Voltage Level Coverage

110kV
Distribution & industrial transformers
220kV
Regional grid & heavy industrial
400kV
Transmission grid & BESS systems
500kV+
EHV & HVDC converter transformers

Ready to Start Your Project?

Contact us for professional supervision tailored to your transformer or BESS project requirements.

Get a Quote →